The exterior work on Loretta’s house was nearly wrapped up this week. This included the second coat of paint on her siding and the brown trim paint by the ladies. The front door ornamental posts got sanded and spray painted by Bernie.Some interior work that got done was texturing, painting walls and ceilings in the kitchen, hall, bedroom. The bathroom had its ceramic tile and drywall removed and rebuilt with a new tub surround.
Some of the group toured the Ocean Star Offshore Drilling Rig Museum, while others explored downtown shops. A stroll on the quiet beach was enjoyed by all.
No comments:
Post a Comment