After seven weeks of work on Shun and Sheila's home our MDS group have developed a special fondness for our clients. Since the majority of our crew will be leaving soon a house blessing was held Wednesday afternoon.


This home is nearly complete and Shun and Sheila are showing their excitement about getting back into their home after living with her mother for five and a half years.

Jake presenting the "Hammer Rings Hope" book and tells a little bit about Mennonite Disaster Service.

Shun and Sheila with some of their family who attended the home blessing.

Cake and ice cream was served after the program. Many expressions of thanks were given by family, neighbours and friends for the service we provided.

A second home blessing took place Thursday morning for Ms Treena's new house. This house was largely built by an Amish MDS group operating out of Gulfport, Mississippi. The RV team finished things up by doing the laminate, ceramic flooring and finish trim work.

Besides the MDS crew there were numerous community people present to wish Ms Treena well. It was mentioned that she was a very deserving client for this new home and that she would take good care of it.


Verna presents a quilted wall hanging created by Mennonite women (Sister Link).

Annette had the honour and priviledge to present Ms Treena with a Bible.

Bert hands over the keys to the new home owner.

A community lady shared how she had encouraged Treena as she applied for help and then needed to wait and wait. Her trust in God carried her through the five and a half year wait.

This plate on Ms Treena's car says it all.

We will be on the road now and may not be able to make regular posts.

Saturday, March 19, 2011

Excited Homeowner Still Waiting

Several completion dates have come and gone, so it's only natural for Ms Treena to be excited about seeing the final steps being made to finish her new home. She usually stops by on her lunch hour to see the progress on her neat little bungalow with it's pleasant front veranda.

Every workday morning our group meets at 7:30 at the Rec Hall in the campground for devotions and work instructions for the day. We are all given the opportunity to share a devotional.

Leaving the Rec Hall and heading to our RV's before leaving for the work sites. Our trailers are located close together in the middle of a 150 site campground. This campground is popular with travelers who make over night stops because of it's location a quarter mile off the I-10, and also has numerous semi-permanent residents who work in the area.



This is the March MDS group.

Spring is in full swing here in the south. The Azalea (above) and the Wisteria (below) started their glorious show this past week. We get to enjoy spring here and again at home.



For our Saturday activities we took in a car show and a portion of the Biloxi air show. After having spent over an hour in a slow moving line-up for the air show parking, we gave up getting to the air field and instead did our viewing from the beach. Below is our first attempt at a video on our blog. The grand finale performance was by the US Navy Blue Angels aerobatic team.



Saturday, March 12, 2011

Alabama Only a 30 Minute Drive

Sunday afternoon March 6 was a sunny breezy day, so we decided to take a driving trip to explore Dauphin Island. This island is located in the south west corner of Alabama in the Gulf of Mexico. It is a barrier island providing protection to Mobile Bay. We drove here via an eight mile causeway and bridge. The island is about one half mile wide and seven miles long. The west end tapers down to a sandbar occupied by vacation homes perched up on stilts. We were amused by this row of mini-condos with boat slips at the rear. They appeared to be no bigger than six feet deep and twelve feet wide with a second floor. It's not clear to us how they were used, but there was a place to dock a large boat right behind each unit.

The east end of the island had a ferry dock for travel by car to the next island. Nearby is Historic Fort Gaines dating back to 1821. We hiked some trails in the woods of the Audubon Bird Sanctuary and came a beach access where we came upon these workers cleaning the sand of residue from the oil spill. Cleaning beach sand with what seemed to be kitchen sifters must be a time consuming job.

Wednesday morning was a slower drive to work along I-10 due to heavy rain and gusty wind conditions, with a tornado warning for our area. We all kept busy indoors, but heard later that some hail and wind damage happened nearby.

Our homeowner Ms Sheila provided a delicious lunch of catfish, potato salad, bean dish and rolls as her thank-you to us.

Finally, after waiting weeks for the doors to arrive the ladies could get this project closer to completion.

Dick has installed all the cabinets and is ready for the challenge of the U-shaped countertop.

After a two week break from siding Jim was put to work to finish the narrow gable sections with lots of angled cuts.

We have been taking note of the spring blossoms, so on Friday a group of us spent the day at Bellingrath Gardens near Mobile, Alabama.



The Bellingrath Gardens and Home were built from 1927 to 1935 and have been open to the public since 1932. See http://www.bellingrath.org/ for more pictures.



Saturday, March 5, 2011

New Worksite in Pascagula, Mississippi

It's Saturday morning as we are working on our blog post for this week, while having an open ear to our weather radio because we know we are under a tornado watch. That's not a comforting feeling while living in an RV. A cold front moving in is causing this unstable weather condition.


Last Saturday we checked out a Garden and Patio Show in Biloxi, hoping to find some ideas for our yard. Instead it was largely a big plant sale and other products. This company was showing their outdoor room possibilities, which were not in our budget.

A feature of the show was for the public to judge potted displays made by participating vendors. Of the twelve displays this was our favorite. This grouping of succulents could do well in our front yard during the hot summer months. We will have to shop at home because we can't bring plants across the border.

This nice little home has been constructed to this point by an Amish MDS group based out of Gulfport. This week we were assigned to put down the concrete board and ceramic floor tile in the laundry, kitchen and bathroom. Ms Treena, the homeowner is showing her excitement as she comes by each day after her work at the local school cafeteria to see the progress made. She had been told her home would be completed three weeks ago. It will be a while yet before its done.

This has been a new experience for us, which required a bit of study first. While Jim measured and cut the concrete board, Annette predrilled and nailed it down. She found using the palm nailer easier than a hammer. I wanted to include a video clip complete with sound effects but the file is really big.

After the first room Annette took on the job of laying the tile while Jim did the cutting and spreading the thinset adhesive. A day after setting the tile we applied the grout.

At the same house Jake and Verna installed laminate flooring in the remainder of the rooms. Verna is not just watching, but is holding the board while Jake hammers it into place. She also cuts boards to length on the chop saw as needed.
After four days on the floor our bodies were ready for a break!