We worked at drywall and put plywood on the floor of Hazel B's laundry and sewing room area. Miss Hazel prepared a wonderful cajun supper for our whole gang.
At Alice R's home this team redid the wall panelling, put up new drywall on the living room ceiling, mudded and textured it. Others painted this ceiling and installed laminate flooring in several rooms of this home.
This group "Hackberry Bluegrass Gospel" entertained our MDS unit weekly during Jan. and Feb. They were an inspiration to us as we were to them. We had several potlucks with them and became like family. The final evening was spent in singing and sharing stories for four hours. We parted with lots of hugs, tears and well wishes.
We ended the month of February with 22 people working at numerous sites. Seven out of ten jobs have been completed in our time here. Out of this group the Canadians out numbered the Americans 14 to 6 with a very strong representation of 8 from Steinbach alone.
We ended the month of February with 22 people working at numerous sites. Seven out of ten jobs have been completed in our time here. Out of this group the Canadians out numbered the Americans 14 to 6 with a very strong representation of 8 from Steinbach alone.