
Annette and Kathy practised their taping and mudding in the attic closet.

Jim sprayed texture on all the ceilings and walls throughout the house. The texture is knocked down with a trowel a half hour after spraying.

Beginning the next stage by cutting in the paint primer.

Our son, Matthew joined us for a week. He was put to work painting ceilings and two coats on the walls.

It was great to have Matthew join our crew of five painting.